The initial plan of the project started in June of 2002 with Larsen Engineers working with Empire State Development to obtain a $200,000 grant fund for this project.
Larsen Engineers provided the engineering services for design of the storm water recycling pond system; drainage piping; and civil works, including a wet well and masonry pump station building over the wet well. The design fire flow capacity is 1,400+ GPM.
Assignments:
- Topographic Survey
- Pond Design
- Civil Works
- Drainage Piping