Larsen Engineers
Phone
Home
About Us
Engineering Services
Our Clients
Projects
News and Events
Contact Us

YMCA Northpoint

ENGINEERING - WITH A PASSION


 

PROJECTS - GREEN SUSTAINABLE PROJECTS



 
     
 

YMCA - Greenkill Lodge

Key Points:
  • Geothermal Loop
  • Radiant Floor
  • Mehcanical Room
  • Dual-flush Toilets
  • Solar Orientation
  • Passive Cooling
  • Soil Insultation
  • LED Lights

Larsen Engineers was responsible for site design and MEP services for the 5,500 SF lodge at the YMCA Greenkill camp site.

Larsen also provided survey and mapping services for the new lodge site.

LEED™ certification is being sought for the project; the design is based on obtaining maximum LEED™ points; Larsen will be providing LEED™ documentation. Larsen Engineers was also responsible for the following LEED™ design features: Subsurface storm water infiltration; and water conservation measures such as low-flow showers and sensorcontrolled, low-flow faucets. Also, use of recycled material, such as recycled concrete, as select fill; and use of fly ash in concrete.

Part of the mechanical systems work included ondemand hot water heaters; geothermal heat pumps (part of the geothermal loop); and Energy Recovery Ventilators (ERVs).

Other design work included: radiant floor heating; LED lights; soil insulation; passive cooling; solar orientation; and dual flush toilets.

 
     
Jobs | Funding Opportunities | Newsletter | Sustainable Communities Blog | Links | Site Map